翻訳と辞書
Words near each other
・ Rene the Cane
・ Rene Tiefert
・ Rene Toft Hansen
・ Rene Tongson
・ Rene Tosoni
・ Rene Toupin
・ Rene Trudell
・ Rene Van Verseveld
・ Rene Villanueva
・ Rene Wagenaar
・ RENEA
・ Rendon, Texas
・ Rendova Island
・ Rendrick Taylor
・ Rendsburg
Rendsburg High Bridge
・ Rendsburg Loop
・ Rendsburg station
・ Rendsburg-Eckernförde
・ Rendsville Township, Stevens County, Minnesota
・ Rendswühren
・ Rendu
・ Rendu Jella Sita
・ Rendu Pondatti Kaavalkaaran
・ Rendu Rella Aaru
・ Rendufe (Amares)
・ Rendulić
・ Rendville, Ohio
・ Rendy Irawan
・ Rendy Siregar


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Rendsburg High Bridge : ウィキペディア英語版
Rendsburg High Bridge

The Rendsburg High Bridge ((ドイツ語:Rendsburger Hochbrücke), officially ''Eisenbahnhochbrücke Rendsburg'') is a railway viaduct on the Neumünster–Flensburg line that also serves as a transporter bridge. The bridge crosses the Kiel Canal at Rendsburg in the German state of Schleswig-Holstein. It is federally owned through the ''Federal Water and Navigation Administration'' that also owns and runs the canal.
==Previous history==
The Kiel Canal (then ''Kaiser-Wilhelm-Kanal'') was built between 1887 and 1895 cutting through existing traffic lines including the railway line between Neumünster and Flensburg for which two parallel swing bridges were built. In 1907 it was decided to enlarge the canal and in the course of this expansion major obstacles were also to be removed.
Main railway lines had right of way over ships on the canal and ships had to stop, losing about half an hour when a train passed. This was considered the major obstacle as the ships were unable to overtake and could pass each other at dedicated enlarged areas so that the traffic on the entire canal was hampered. Especially the navy pressed for a separation of traffic flows as closed bridges could delay flotillas by several hours.
In order to allow the railway line to pass above the canal, the new bridge was to have a clearance over the canal's mean water level of 42 metres. The existing tracks crossed the canal about 7 metres above the canal's water level, so the tracks had to be elevated by about 36.5 metres including additional 1.5 metres to accommodate the thickness of the lower girder. The required maximum incline of 1:150 (one metre gain in altitude per 150 metres distance) made it necessary to build elevated embankments and access bridges of about 5.5 km at each side.〔